Company overview
Powerchina Sepco1 Electric Power Construction Co., Ltd.
USCC
9137000016304450X1
Id2
370000018015164
English Name
Powerchina Sepco1 Electric Power Construction Co., Ltd.
Former names
山东电力建设第一工程公司
Chinese Name
中国电建集团山东电力建设第一工程有限公司
Entity type
Limited Liability Company (Sole Legal-Person Ownership, Non-Natural Person)
Authorized capital
¥160,843
office@sepco1.com
Phone
+8653166227999
Representative
张洪梅 (Zhang Hong Mei)
Establishment date
7 November 1980
Country
China
Primary goods traded
- 61.3% — Iron or steel (730890)
- 17.0% — Steel, alloy (730650)
- 11.8% — Iron or steel (excluding cast iron) (730539)
- 5.1% — Machinery (843139)
- 4.7% — Iron or steel (732690)
Main Trading Partners
| Partner | Type | Total Value | Percentage |
|---|---|---|---|
| PT Kaltara Power Indonesia | buyer | $15,596,261 | 98.08% |
| PT Powerchina Sepco1 Electric Power Construction Indonesia | buyer | $234,464 | 1.47% |
Loading chart...
Loading chart...
Loading chart...
Loading chart...
Trade Data
| Data Source | HS Code | Description | Buyer | Buyer Country | Seller | Seller Country | ||
|---|---|---|---|---|---|---|---|---|
| 31 October 2024 | ID | 73089099 | Steel Structure Completed With Accessories: Steel Frame(including Support,secondary Beam) | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $2,537,360.71 | |
| 10 July 2024 | ID | 73089099 | Steel Frame (Including Support And Secondary Beam)Fabricated | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $1,537,924.46 | |
| 12 December 2024 | ID | 73089099 | Steel Structure Completed With Accessories: Steel Frame (Including Support, Secondary Beam) | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $1,081,998.45 | |
| 24 December 2024 | ID | 73089099 | Steel Structure Completed With Accessories : Steel Frame (Including Support, Secondary Beam) | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $922,734.08 | |
| 11 September 2024 | ID | 73065019 | Circulating Water Pipeline Outside The Factory Area | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $835,001.47 | |
| 24 December 2024 | ID | 73053990 | Circulating Water Pipeline Completed With Accessories | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $822,229.66 | |
| 5 December 2024 | ID | 73089099 | Steel Structure Completed With Accessories : Steel Frame (Including Support, Secondary Beam) | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $813,222.90 | |
| 11 October 2024 | ID | 84313990 | Steel Coal Hopper | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $693,673.80 | |
| 20 August 2024 | ID | 73065019 | Circulating Water Pipeline | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $586,472.14 | |
| 17 March 2025 | ID | 73065019 | Circulating Water Pipeline And Accessories: Circulating Water Pipe Outside The Factory Areamaterial : Q235b | PT Kaltara Power Indonesia | ID | Powerchina Sepco1 Electric Power Construction Company Limited | $462,300.19 |
0 of 20 row(s) selected.