Company overview
PT Karimun Sembawang Shipyard
Name
PT Karimun Sembawang Shipyard
Entity type
PT (Limited Liability Company)
Province
DKI Jakarta
Regency
Kota Adm. Jakarta Selatan
District
Setiabudi
Village
Kuningan Timur
Address
Menara Rajawali Lt. 7. Jl. Dr. Ide Anak Agung Gde Agung
Postal code
12950
Country
Indonesia
Primary goods traded
- 96.3% — Floating or submersible drilling or production platforms (890520)
- 1.7% — Buildings (940690)
- 1.3% — Iron or steel (732690)
- 0.4% — Trailers, semi-trailers and other vehicles not mechanically propelled (871690)
- 0.3% — Iron or steel (730890)
Main Trading Partners
| Partner | Type | Total Value | Percentage |
|---|---|---|---|
| Jurong Shipyard Pte Ltd | buyer | $15,046,210 | 2.71% |
Loading chart...
Loading chart...
Loading chart...
Loading chart...
Loading chart...
Trade Data
| Data Source | HS Code | Description | Buyer | Buyer Country | Seller | Seller Country | ||
|---|---|---|---|---|---|---|---|---|
| 8 April 2025 | ID | 89052000 | Dss38e Floating Oil And Natural Gas Drilling Platform; Class 3Dynamic Positioning; Displacement Above 52000T; With Anchoringarrangement For Sheltered Waters; Water Depth Up To 3000M(500m To 3000M In Dp Operations); Total Well Depth: Up To Loooom;well Control Pressure: 15000Psi; Self-Propelled With A Minimumspeed Of 7.5 Knots; Accommodation: Minimum 180 People Onboard; With Helideck | PT Karimun Sembawang Shipyard | ID | Fernvale Pte Limited C O Seatrium New Energy Limited | $279,849,909.16 | |
| 9 March 2025 | ID | 89052000 | Dss38e Floating Oil And Natural Gas Drilling Platform Incomplete; Class 3 Dynamic Positioning; Displacement Above 52000T; With Anchoring Arrangement For Sheltered Waters; Water Depth Up To 3000M (500M To 3000M In Dp Operations); Total Well Depth: Up To 10000M; Well Control Pressure: 15000Psi;accommodation: Minimum 180 People On Board; With Uncompleted Helideck, Without Derrick Tower | PT Karimun Sembawang Shipyard | ID | Fernvale Pte Limited C O Seatrium New Energy Limited | $249,267,754.38 | |
| 24 July 2020 | ID | 94069030 | Block - 2159J151117 : Living Quarter Block - (Lq) | Jurong Shipyard Pte Limited | SG | PT Karimun Sembawang Shipyard | ID | $3,258,065.79 |
| 28 February 2020 | ID | 73269099 | Block - 7153 : Raiser Deck Block - (Rdk - Cfa1) | Jurong Shipyard Pte Limited | SG | PT Karimun Sembawang Shipyard | ID | $1,982,471.97 |
| 16 October 2019 | ID | 73269099 | Block - 7153 : Drill Floor Block - Dfa - Dfl | Jurong Shipyard Pte Limited | SG | PT Karimun Sembawang Shipyard | ID | $1,973,404.32 |
| 8 November 2021 | ID | 94069030 | Project - 2159J110015 : Block Pr04c+d | Jurong Shipyard Pte Limited | SG | PT Karimun Sembawang Shipyard | ID | $329,850.59 |
| 14 December 2020 | ID | 94069030 | Project - 2159J420004 : Mol-Living Quarter | Jurong Shipyard Pte Limited | SG | PT Karimun Sembawang Shipyard | ID | $318,005.47 |
| 17 March 2025 | ID | 94069030 | Project - 2159J112426 : Block Apgs - 24.70M X 8.40Mx 7.50M | Seatrium Sg Pte Limited | SG | PT Karimun Sembawang Shipyard | ID | $316,086.08 |
| 5 February 2025 | ID | 94069030 | Project - 2159J112426 : Block Apgp - 24.70M X 8.40M X 7.50M | Seatrium Sg Pte Limited | SG | PT Karimun Sembawang Shipyard | ID | $312,675.34 |
| 7 July 2020 | SG | 40169400 | Fender (Yokohama) C/W Lifting Gears | PT Karimun Sembawang Shipyard | ID | Lv Shipping Singapore Pte Limited | SG | $303,089.00 |
0 of 20 row(s) selected.