Company overview

PT Karimun Sembawang Shipyard

Name

PT Karimun Sembawang Shipyard

Entity type

PT (Limited Liability Company)

Province

DKI Jakarta

Regency

Kota Adm. Jakarta Selatan

District

Setiabudi

Village

Kuningan Timur

Address

Menara Rajawali Lt. 7. Jl. Dr. Ide Anak Agung Gde Agung

Postal code

12950

Country

Indonesia

Primary goods traded

  • 96.3% — Floating or submersible drilling or production platforms (890520)
  • 1.7% — Buildings (940690)
  • 1.3% — Iron or steel (732690)
  • 0.4% — Trailers, semi-trailers and other vehicles not mechanically propelled (871690)
  • 0.3% — Iron or steel (730890)
Main Trading Partners
PartnerTypeTotal ValuePercentage
Jurong Shipyard Pte Ltdbuyer$15,046,2102.71%
Loading chart...
Loading chart...
Loading chart...
Loading chart...
Loading chart...
Trade Data
Data SourceHS CodeDescriptionBuyerBuyer CountrySellerSeller Country
8 April 2025ID89052000Dss38e Floating Oil And Natural Gas Drilling Platform; Class 3Dynamic Positioning; Displacement Above 52000T; With Anchoringarrangement For Sheltered Waters; Water Depth Up To 3000M(500m To 3000M In Dp Operations); Total Well Depth: Up To Loooom;well Control Pressure: 15000Psi; Self-Propelled With A Minimumspeed Of 7.5 Knots; Accommodation: Minimum 180 People Onboard; With HelideckPT Karimun Sembawang ShipyardIDFernvale Pte Limited C O Seatrium New Energy Limited$279,849,909.16
9 March 2025ID89052000Dss38e Floating Oil And Natural Gas Drilling Platform Incomplete; Class 3 Dynamic Positioning; Displacement Above 52000T; With Anchoring Arrangement For Sheltered Waters; Water Depth Up To 3000M (500M To 3000M In Dp Operations); Total Well Depth: Up To 10000M; Well Control Pressure: 15000Psi;accommodation: Minimum 180 People On Board; With Uncompleted Helideck, Without Derrick TowerPT Karimun Sembawang ShipyardIDFernvale Pte Limited C O Seatrium New Energy Limited$249,267,754.38
24 July 2020ID94069030Block - 2159J151117 : Living Quarter Block - (Lq)Jurong Shipyard Pte LimitedSGPT Karimun Sembawang ShipyardID$3,258,065.79
28 February 2020ID73269099Block - 7153 : Raiser Deck Block - (Rdk - Cfa1)Jurong Shipyard Pte LimitedSGPT Karimun Sembawang ShipyardID$1,982,471.97
16 October 2019ID73269099Block - 7153 : Drill Floor Block - Dfa - DflJurong Shipyard Pte LimitedSGPT Karimun Sembawang ShipyardID$1,973,404.32
8 November 2021ID94069030Project - 2159J110015 : Block Pr04c+dJurong Shipyard Pte LimitedSGPT Karimun Sembawang ShipyardID$329,850.59
14 December 2020ID94069030Project - 2159J420004 : Mol-Living QuarterJurong Shipyard Pte LimitedSGPT Karimun Sembawang ShipyardID$318,005.47
17 March 2025ID94069030Project - 2159J112426 : Block Apgs - 24.70M X 8.40Mx 7.50MSeatrium Sg Pte LimitedSGPT Karimun Sembawang ShipyardID$316,086.08
5 February 2025ID94069030Project - 2159J112426 : Block Apgp - 24.70M X 8.40M X 7.50MSeatrium Sg Pte LimitedSGPT Karimun Sembawang ShipyardID$312,675.34
7 July 2020SG40169400Fender (Yokohama) C/W Lifting GearsPT Karimun Sembawang ShipyardIDLv Shipping Singapore Pte LimitedSG$303,089.00
0 of 20 row(s) selected.