Company overview

PT North Sumatera Hydro Energy

Name

PT North Sumatera Hydro Energy

Entity type

PT (Limited Liability Company)

Province

DKI Jakarta

Regency

Kota Adm. Jakarta Selatan

District

Kebayoran Baru

Village

Senayan

Address

Pacific Century Place, Lantai 37, Scbd Lot 10, Jalan Jenderal Sudirman, Kavling 52-53

Postal code

12190

Country

Indonesia

Primary goods traded

  • 43.9% — Turbines (841013)
  • 27.9% — Steel, alloy (722540)
  • 22.3% — Electric generating sets (850239)
  • 3.0% — Boards, panels, consoles, desks and other bases (853710)
  • 2.9% — Turbines (841012)
Main Trading Partners
PartnerTypeTotal ValuePercentage
Sinohydro Corporation Limitedseller$53,728,67697.12%
Loading chart...
Loading chart...
Loading chart...
Loading chart...
Trade Data
Data SourceHS CodeDescriptionBuyerBuyer CountrySellerSeller Country
14 June 2024ID84101300Turbine System:draf Tube;material Carbon Steel 04Cr13ni5mo+q235b; Size: Dia 2330.6-3490Mm; Including Draft Tube Elbow, Cone And Extension SectionPT North Sumatera Hydro EnergyIDSinohydro Corporation Limited$8,805,278.97
29 July 2023ID72254090Steel Plate Q690sd, Thickness: 10Mm-130mm, Wide: 1M-3m, Length: 5M-12mPT North Sumatera Hydro EnergyIDSinohydro Corporation Limited$6,480,120.45
26 August 2024ID84101300Turbine System:governor System; Type;p.I.D Electro-Hydraulic Governor Wdt-100-6.3; Time Of Speed Governor; Tc 0.2S;kp:0.15-0.25,ki:0.05-0.15; Kd:0.2-0.25PT North Sumatera Hydro EnergyIDSinohydro Corporation Limited$5,191,910.88
8 December 2022ID72254090Steel Plates For Pressure Vessels : Q609sd Q690se Q490sd Thickess : 22Mm-130mm Wide : 1,2M-2,7mPT North Sumatera Hydro EnergyIDSinohydro Corporation Limited$5,053,905.80
26 March 2025ID85023932Hydro Power Generator System: Stator; Type: Sf130.9-18/6530; Rated Output: 130.9 Mw/154 Mva; Rated Voltage: 13.8 Kv; Rated Current: 6442.9 A; Power Factor: 0.85 Lagging; 50 Hz; Speed: 333.3R/MinPT North Sumatera Hydro EnergyIDSinohydro Corporation Limited$4,025,153.59
13 February 2024ID72254090Steel Plate Thick : 14Mm-42mm, Wide 2M-2,5mPT North Sumatera Hydro EnergyIDSinohydro Corporation Limited$2,787,341.38
26 August 2024ID84101300Turbine System:turbine Inlet Valve; Rated Flow:53m3/S;pressure:4.1mpa; Oil Pressure :16-20Mpa;dia 2420MmPT North Sumatera Hydro EnergyIDSinohydro Corporation Limited$2,382,821.81
25 January 2025ID84101300Turbine System: Turbine; Type: Francis Type Hl-Lj-320;specification: Nr=131.27 Mw; Hr=275.86; N=333.3rpm; D1=3.6m; Including Distributor, Runner, Shaft, Guide Bearing, Servomotor, Automation ElementPT North Sumatera Hydro EnergyIDSinohydro Corporation Limited$2,322,452.68
30 October 2024ID85023932Hydro Power Generator System: Pedestal For Generator; Material Carbon Steel Q235b;outlet Dia: 1550MmPT North Sumatera Hydro EnergyIDSinohydro Corporation Limited$2,299,184.43
28 December 2024ID85023932Hydro Power Generator System: Generator Circuit Breaker, Specification: Un=17. 5Kv, In=8000a, Idn-63kaPT North Sumatera Hydro EnergyIDGrid Solutions Sas$1,595,030.00
0 of 20 row(s) selected.