Company overview

PT Palmas Project Engineering

Name

PT Palmas Project Engineering

Entity type

PT (Limited Liability Company)

Province

DKI Jakarta

Regency

Kota Adm. Jakarta Barat

District

Kebon Jeruk

Village

Kedoya Utara

Address

Rukan Green Garden Blok Z 2 No. 79

Postal code

11520

Country

Indonesia

Primary goods traded

  • 50.5% — Boilers (840212)
  • 14.1% — Boilers (840219)
  • 13.5% — Machinery (847920)
  • 12.2% — Dryers (841934)
  • 9.6% — Machines and mechanical appliances (847990)
Main Trading Partners
PartnerTypeTotal ValuePercentage
Boilermech Sdn. Bhd.seller$1,881,76625.51%
Ecoscience Manufacturing & Engineering Sdn. Bhd.seller$810,30110.99%
Wasco Thermal Sdn. Bhd.seller$525,8897.13%
Eaton Industries Pte. Ltd.seller$355,0774.81%
Alfa Laval Malaysia Sdn. Bhd.seller$324,3434.40%
Kejuruteraan Wang Yuen Sdn. Bhd.seller$316,7414.29%
Brooks Andell Sdn. Bhd.seller$160,3862.17%
Lpc Industries Sdn. Bhd.seller$152,6092.07%
Sri Sinaco Engineering Works Sdn. Bhd.seller$132,3201.79%
Loading chart...
Loading chart...
Loading chart...
Loading chart...
Trade Data
Data SourceHS CodeDescriptionBuyerBuyer CountrySellerSeller Country
28 February 2019ID84021211One Unit Bmwt4535sat Bi-Drum Water Tube Boiler Having Actual Evaporating Capacity Of 45,000Kg/HPT Palmas Project EngineeringIDBoilermech Sdn Bhd$1,011,765.84
26 April 2022ID84021211One (1) Unit Bmvg4035 Bi-Drum Water Tube Boiler Having Actual Evaporating Capacity Of 40,000Kg/Hr Mcr At 32 Barg Working Pressure, Saturated Steam C/W AncillariesPT Palmas Project EngineeringIDBoilermech Sdn BhdMY$870,000.00
22 April 2022ID84193420Sterilizer (Cmc) Dia 3200Mm X 13000Mm SlPT Palmas Project EngineeringIDEcoscience Manufacturing & Engineering Sdn BhdMY$362,934.95
26 April 2022ID842121223 Phase Decanter Panx600 Cs C/W AccessoriesPT Palmas Project EngineeringIDAlfa Laval Malaysia Sdn BhdMY$324,342.88
28 February 2019ID82041200Sterilizer (Cmc) 3200Mm Dia X 13000Mml (Without Hydraulic Door)PT Palmas Project EngineeringIDEcoscience Manufacturing & Eng Sdn Bhd$294,497.44
26 November 2018ID84122100Palm Oil Mill Equipments: Eaton Automation For Cmcsystem Baik/BaruPT Palmas Project EngineeringIDEaton Industries Pte Limited$279,374.91
15 October 2024ID84021919One (1) Unit Of 6 Tons/Hr Boiler @10 Bar(g) Pressure With Saturated Steam Mackenzie Bi-Drum Water Tube Boiler Complete With All Auxiliary EquipmentsPT Palmas Project EngineeringIDWasco Thermal Sdn Bhd$270,000.00
18 January 2022ID90329090Cmc Electrical & Automation System Baik/BaruPT Palmas Project EngineeringIDDanfoss Power Solutions II Pte Limited$256,810.07
19 September 2024MY8402191900One (1) Unit Of 6Tons/Hr Boiler@10bar(g) Pressure With Saturated SteamPT Palmas Project EngineeringIDWasco Thermal Sdn BhdMY$255,888.96
1 March 2019ID84212290Decanter 3-Phase Panx 600 Cs (Con) C/W AccessoriesPT Palmas Project EngineeringIDAlfa Lafal Malaysia Sdn Bhd$228,564.32
0 of 20 row(s) selected.