Company overview
PT Tanjung Power Indonesia
Name
PT Tanjung Power Indonesia
Entity type
PT (Limited Liability Company)
Location
DKI Jakarta, Kota Adm. Jakarta Selatan, Setiabudi, Kuningan Timur
Address
Menara Karya Lt. 7 Unit E, Jl. H.R. Rasuna Said Block X-5 Kav. 1-2
Postal code
12950
Country
Indonesia
Court Cases (3)
Primary goods traded
- 40.3% — Pumps (841370)
- 18.4% — Heat exchange units (841950)
- 15.4% — Fans (841459)
- 15.1% — Boilers (840290)
- 10.8% — Electric motors (850153)
Main Trading Partners
Loading chart...
Loading chart...
Trade Data
| Data Source | HS Code | Description | Buyer | Buyer Country | Seller | Seller Country | ||
|---|---|---|---|---|---|---|---|---|
| 15 February 2018 | ID | 84137099 | Boiler Feedwater Pump And Motor And Auxiliaries Baik/Baru | PT Tanjung Power Indonesia | ID | Hyundai Engineering Company Limited | KR | $4,631,703.12 |
| 9 February 2018 | ID | 84195091 | Condenser And Auxiliaries Baik/Baru | PT Tanjung Power Indonesia | ID | Hyundai Engineering Company Limited | KR | $2,115,035.52 |
| 9 February 2018 | ID | 73049090 | Piping And Fitting For Water And Wastewater Treatment System Baik/Baru | PT Tanjung Power Indonesia | ID | Hyundai Engineering Company Limited | KR | $919,219.51 |
| 10 May 2019 | ID | 84313990 | Parts For Bulk Material Handling Equipment (Initial) Baik / Baru | PT Tanjung Power Indonesia | ID | Raumaster O B Hyundai Engineering Company Limited | $811,773.98 | |
| 13 February 2018 | ID | 85015300 | High Voltage Motor Baik/Baru | PT Tanjung Power Indonesia | ID | Hyundai Engineering Company Limited | KR | $756,422.04 |
| 13 February 2018 | ID | 84145999 | Primary Air Fan Baik/Baru | PT Tanjung Power Indonesia | ID | Hyundai Engineering Company Limited | KR | $624,048.02 |
| 26 March 2019 | ID | 84145920 | Auxiliaries For Draft Unit Baik / Baru | PT Tanjung Power Indonesia | ID | Hyundai Enginerring & Construction Co Sa | $443,695.93 | |
| 13 February 2018 | ID | 84145999 | Induced Draft Fluega Fan Baik/Baru | PT Tanjung Power Indonesia | ID | Hyundai Engineering Company Limited | KR | $403,424.81 |
| 13 February 2018 | ID | 85042329 | Unit Auxiliary Transformer Baik/Baru | PT Tanjung Power Indonesia | ID | Hyundai Engineering Company Limited | KR | $399,239.23 |
| 9 February 2018 | ID | 85042329 | Unit Auxiliary Transformer And Auxiliaries - Unit Auxiliary Transfermer Baik/Baru | PT Tanjung Power Indonesia | ID | Hyundai Engineering Company Limited | KR | $399,239.20 |
0 of 20 row(s) selected.